Foundation systems for
New Construction in Oregon
New Foundations for Homes in Oregon, and new Foundations for commercial buildings in Oregon.
The Oregon Helical Piers Foundation Systems are designed, tested, and proven for application in fill areas, expansive soils, high water table soils, and other areas where unstable soils require piering.
Oregon Helical Piers is the only company with a pre-engineered and manufactured underpinning system evaluated and listed by all national building code agencies.
BOCA Report # 94-27 ICBO Report # EER5110 SBCCI Report # 9504
The new construction HELICAL PIER Foundation Systems reinforce footing or stem walls. The anchors are placed every 8 to 10 feet, based on the load of the structure and bearing strength of the soil.
A small crew, along with a skid loader, can set 50 or more anchors in less than a day. Anchors rated by the building codes for working loads of 10 to 20 tons are typical.